Each stage of the build is signed off by a designated inspector at the mandatory checkpoints. This page tracks the status of those inspections.
Note: This page mirrors the stage inspection sign-offs in the build log. The signed, dated inspection sheets are the official record submitted to the South African Civil Aviation Authority (SACAA) — this table is for at-a-glance status only.
| # | Section | Status | Inspector | Date signed |
|---|---|---|---|---|
| 1 | Empennage | Pending | — | — |
| 2 | Wing | Pending | — | — |
| 3 | Fuselage | Pending | — | — |
| 4 | Undercarriage | Pending | — | — |
| 5 | Canopy | Pending | — | — |
| 6 | Firewall Forward & Fuel System | Pending | — | — |
| 7 | Electrics | Pending | — | — |
| 8 | Finishing | Pending | — | — |
| 9 | Heater Air System | Pending | — | — |